Zhuohang Precision Machining FactoryCNC Precision Milling

Cookie Policy

Zhuohang MES production management dashboard, Dongguan, China

This page lists every cookie and local-storage item this site sets, why it is set, and how long it stays. We aim to keep this list short — your site should not need twenty trackers to load.

1. What is a cookie

A cookie is a small text file a website stores in your browser. We use only the categories below. We do not run advertising networks, audience-extension platforms, or cross-site remarketing on this site.

2. Cookies we set

CookiePurposeStorageDurationCategory
Consent choiceRemembers whether you accepted or rejected analytics.local storage12 monthsStrictly necessary
Anonymous session statsCounts page views in aggregate, without identifying you.first-party cookie30 minutesStatistics (opt-in)
Form draft (in-progress RFQ)Restores text you typed into a quote form if the page reloads.session storageUntil tab closesStrictly necessary

3. What we do not set

4. Your choices

On first load you see a three-button consent banner (Accept all / Reject all / Essential only). Your choice is stored and honored for 12 months. You can change it anytime by clearing the consent item in your browser and reloading.

If you reject analytics, we do not load the statistics cookie. If you accept, only the items listed above load — never advertising.

5. Browser controls

Most browsers let you view and delete cookies in Settings. For instructions in yours: Chrome · Firefox · Safari · Edge.

6. Do we sell the data?

No. The data above is used to make the site work and to understand, in aggregate, which content helps buyers. We do not sell, rent, or share it with third parties for their own purposes.

7. Updates

If we add a new cookie, we update this page and bump the date below. We will not silently add advertising trackers.

What this shop actually runs

A buyer asking for capability evidence should get a specific answer. The facility behind this guide operates 100+ CNC machines across a 6,800 m2 plant in Dongguan, China, with 100+ staff. The machine list by category:

  • 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Applied to compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
  • 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Applied to prismatic parts, plates, brackets, housings.
  • Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Applied to long, slender rotational parts at ±0.002 mm.
  • CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Applied to shafts, bushings, flanges up to ±0.002 mm.
  • Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Applied to hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
  • Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
  • Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.

Tolerance bands held: ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, ±0.002 mm on precision grinding and wire EDM. Capability indices: Ppk >= 1.67 initial on key characteristics; Cpk >= 1.33 ongoing in production.

Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded - disclosed openly), ISO 14001:2015 (116024/B/0001/UK/En). Certificates are issued to Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005).

Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa. Based in China, serving customers worldwide.

Contact: Felipe Iglesias, [email protected], +86 13126536955.

Standards referenced on this page

  • ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
  • ISO 9001 — Quality management systems — Requirements
  • ASTM E8/E8M-21 — Standard Test Methods for Tension Testing of Metallic Materials