Zhuohang Precision Machining FactoryCNC Precision Milling

Dongguan Zhuohang Ltd

Zhuohang MES production management dashboard, Dongguan, China

Dongguan Zhuohang Ltd — a Chinese CNC machining company, ISO 9001 and IATF 16949 (product design excluded) certified, with a precision machining factory in China.

What Dongguan Zhuohang Ltd is

For a buyer qualifying a milling supplier, the legal entity behind the brand is part of the risk assessment. Dongguan Zhuohang Ltd is the legal entity behind the CNC Precision Milling brand. It was registered in Dongguan, Guangdong, China in 2005 and is the contracting party on purchase orders, invoices and quality documents. If a buyer ever needs to verify the company, the registration number can be checked against the official business registry of China.

Registered itemDetails
Legal nameDongguan Zhuohang Ltd
Registration number91441900MA4UWT6X39
Founded2005
Registered locationDongguan, Guangdong, China
Production facilityNo. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470
Certifications heldISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (product design excluded) (131941/A/0001/SM/En), ISO 14001:2015 (116024/B/0001/UK/En)

How the entity relates to the CNC Precision Milling brand

CNC Precision Milling is the marketing brand shown on this site; Dongguan Zhuohang Ltd is the legal entity that signs contracts, issues invoices and takes quality responsibility. The two are the same company — the brand is how the company presents itself to buyers, the legal entity is how it exists in law.

Why the legal entity matters to buyers

See the production facility

For the physical factory floor — equipment, inspection and capacity — see the CNC Precision Milling factory page.

Contact the entity

Email [email protected] or call +86 13126536955. Correspondence address: No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470.